Contractor College

Awards, Continuing Education News, Contractor College, Industry News, Member News, News

Colorado State University Global Receives 2020 Executive Strategic Initiatives Award from IECRM 

At the August 13 IECRM Summit Awards Ceremony, Colorado State University Global (CSU Global) received the 2020 Executive Strategic Initiatives Award from IECRM. The award was given in recognition for their partnership and collaborative work on behalf of IECRM’s Electrical Apprenticeship Training Program and the offering of additional transferrable higher

Continuing Education News, Contractor College, Electrical Contractor Spotlights & Industry Success Stories, Industry News, Join IECRM as a Member or Industry Partner, Member News, News

CONTRACTOR SPOTLIGHT: Neal Woodcock

Electrical Contracting is the Greatest Trade to be in! About… Neal Woodcock arrived in Colorado in 1987. For several years, he worked in the restaurant industry around the area. When he turned 28, he got a job at Bryant Electric as an apprentice after responding to an ad in the

Continuing Education News, Contractor College, Industry News, Member News, News

Question: With Xcel Energy now enforcing the removal of PV production metering for systems less than 10kW DC, do installers still need an “AC disconnect”?

Inspector Perspective:  First it is important to note that the consensus reached, are only for those PV systems utilizing an interconnection method on the load-side of the service disconnecting means, as described in NEC 705.12, interconnection methods on the supply-side of the service disconnecting means shall continue to meet the

Scroll to Top

Chat with OHMER for lightning fast answers to your questions!

Be Added to the Hire List

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
I am a..*