March 1, 2022

News

Subscribe to Our 2022 Event Calendar!

We know you have a lot going on and so do we! Never miss another one of your favorite IECRM events – simply subscribe to our “Save the Date” calendar and you can easily see our event dates from your own calendar dashboard with a click of a button. Outlook […]

News

Code Question of the Month – March 2022

Code Question If a transformer primary overcurrent protection device is sized at 250 percent of the primary current, what size secondary overcurrent protection device is required if the secondary current is 42 amperes? Select one: a. 40 amperes b. 70 amperes c. 60 amperes d. 90 amperes Answer: c. 60 amperes 42 X 1.25 = 52.5

News

Inspectors Perspective – March 2022

AHJ Field Problems Question: Do the splices for a low voltage lighting system require a box when the lighting system is powered from a Class 2 power source? Answer:  Yes, 300.15 Boxes, Conduit Bodies, or Fittings — Where Required. A box shall be installed at each outlet and switch point

News

Colorado Electrical License Renewal

IECRM offers three different CEU Class formats designed to fit your learning style and schedule. The states of Colorado, Wyoming, and New Mexico require 24 hours of electrical CEU classes before you may renew your electrical license at the end of the code cycle. A minimum of 4 hours of

News

The Power of Change! An American Road Trip

A Letter from the CEO I recently experienced a wonderful 2,000 mile road trip halfway across the country from Florida to Colorado loaded down with a rented SUV packed full of family memories. I love to drive and what I expected was some windshield time to listen and sing along

Scroll to Top

Chat with OHMER for lightning fast answers to your questions!

Be Added to the Hire List

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
I am a..*