Question: With Xcel Energy now enforcing the removal of PV production metering for systems less than 10kW DC, do installers still need an “AC disconnect”?
Inspector Perspective: First it is important to note that the consensus reached, are only for those PV systems utilizing an interconnection method on the load-side of the service disconnecting means, as described in NEC 705.12, interconnection methods on the supply-side of the service disconnecting means shall continue to meet the […]