Code Question of the Month – January 2022

A very long branch circuit has been installed underground in Schedule 40 PVC. The circuit extends from a 120/208-volt, 3-phase, 4-wire panelboard to the load. The branch circuit conductors are connected to a 20-A circuit breaker in the panel. Due to voltage drop considerations, 1 AWG circuit conductor has been […]

News

Inspector’s Perspective

AHJ: Field problems Question: How are jurisdictions handling issuing certificates of occupancies where projects are waiting for equipment and materials. Answer: After speaking with several different jurisdictions the majority consensus is issuing a temporary certificate of occupancy until the project can be completed per approved plans. This may vary where

News

IECRM Hosts COVID-19 Testing Site Again in 2022

In response to the ongoing need for COVID testing and a designated testing site in the North Metro community, IECRM is once again welcoming a “Colorado Drive-Up COVID Testing Team” in the North parking lot of its main campus in Northglenn for the next few months for COVID PCR testing.

Scroll to Top

Chat with OHMER for lightning fast answers to your questions!

Be Added to the Hire List

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
I am a..*